Cost of Rail (Read 2780 times)

RSN172

Cost of Rail
« on: March 18, 2021, 09:10:33 PM »
Well, my prediction of rail costing $10B when the expert prediction was $7.4B, got blown out of the water today. New estimate is $12.4B and 10 more years to complete.  At this time I will make another prediction.  $17B will be wasted and it will not be completed in the next 12 years.  By completed I mean all the way to Ala Moana like the original plan called for and HART is still trying to accomplish. 
Happily living in Puna

ren

Re: Cost of Rail
« Reply #1 on: March 18, 2021, 09:33:31 PM »
This rail project is nothing more than theft from the people of Hawaii.
Deeds Not Words

Inspector

Re: Cost of Rail
« Reply #2 on: March 19, 2021, 03:34:16 AM »
Well, my prediction of rail costing $10B when the expert prediction was $7.4B, got blown out of the water today. New estimate is $12.4B and 10 more years to complete.  At this time I will make another prediction.  $17B will be wasted and it will not be completed in the next 12 years.  By completed I mean all the way to Ala Moana like the original plan called for and HART is still trying to accomplish.
I worked on the rail for a little over a year. There was so much waste. Much like the waste at the state IT department. I witnessed a lot of materials abandoned and thrown away. Perfectly good and usable materials. I witnessed design changes that were made to try and save money for the state. But ended up costing more because there was little to no communication between HART, the engineer and the contractor. For instance, the contractor brings in a crane that was sufficient to lift a rebar cage. But the rebar cage was redesigned and no one informed the contractor. The newly designed cage is significantly heavier than the original cage. The crane that the contractor brought in to lift the original cage is insufficient to lift the new one. So now the contractor has to pay a lot of money to move out the smaller crane and bring in a much larger one. Then there were construction delays. The contractor had every right to back charge the state for all these additional costs. These sort of things happened all the time.
SCIENCE THAT CAN’T BE QUESTIONED IS PROPAGANDA!!!

groveler

Re: Cost of Rail
« Reply #3 on: March 19, 2021, 05:33:03 AM »
I personally don't care if Democrats commit suicide.
I just demand they don't drag me down with them.
I will do everything necessary to not comply.
Build your train. it will be a good place for the homeless to sleep,
relieve themselves and shoot up.
Just don't expect the outer islands to pay for your Oahu
wet dream.

QUIETShooter

Re: Cost of Rail
« Reply #4 on: March 19, 2021, 06:04:11 AM »
I hated this rail BS from the very beginning.  And I hate it even more now (if that is even possible) with all of this over-running delays and costs.

It's like all my perceived nightmares before they even started this thing has come true.

I worked on the rail for a little over a year. There was so much waste. Much like the waste at the state IT department. I witnessed a lot of materials abandoned and thrown away. Perfectly good and usable materials. I witnessed design changes that were made to try and save money for the state. But ended up costing more because there was little to no communication between HART, the engineer and the contractor. For instance, the contractor brings in a crane that was sufficient to lift a rebar cage. But the rebar cage was redesigned and no one informed the contractor. The newly designed cage is significantly heavier than the original cage. The crane that the contractor brought in to lift the original cage is insufficient to lift the new one. So now the contractor has to pay a lot of money to move out the smaller crane and bring in a much larger one. Then there were construction delays. The contractor had every right to back charge the state for all these additional costs. These sort of things happened all the time.

How true.  And in many instances the contractor ends up with the short end of the stick.  In the days when I was still working I remember the nightmares of lack of communication between the developer, engineer, and contractor (who I worked for).  I've spearheaded some projects as a field foreman and saw how f*cked up things can get in the higher echelons and finally find it's way down to my level. 

By then the shit literally hit the fan and the fan was set on high speed......

This rail thing is outdated, high maintenance, and obsolete when or if it ever gets finished.
Sometimes you gotta know when to save your bullets.

Inspector

Re: Cost of Rail
« Reply #5 on: March 19, 2021, 10:40:27 AM »
I hated this rail BS from the very beginning.  And I hate it even more now (if that is even possible) with all of this over-running delays and costs.

It's like all my perceived nightmares before they even started this thing has come true.

How true.  And in many instances the contractor ends up with the short end of the stick.  In the days when I was still working I remember the nightmares of lack of communication between the developer, engineer, and contractor (who I worked for).  I've spearheaded some projects as a field foreman and saw how f*cked up things can get in the higher echelons and finally find it's way down to my level. 

By then the shit literally hit the fan and the fan was set on high speed......

This rail thing is outdated, high maintenance, and obsolete when or if it ever gets finished.
A few years back I posted most of my disagreements with the rail here in some long forgotten thread. You stated it is outdated. I am sure that is  true. But it is also a heavy rail system. We probably could have saved near 50% of the cost if they had decided on building light rail instead. I see no need for a heavy rail system here. But what do I know?
SCIENCE THAT CAN’T BE QUESTIONED IS PROPAGANDA!!!

changemyoil66

Re: Cost of Rail
« Reply #6 on: March 19, 2021, 12:38:41 PM »
It's like that GF who says they're sorry they cheated on  you and you give them a 2nd chance.  Then a 3rd chance and so on.

After seeing how a rail runs in TAiwan (spider web), the one in HI makes zero sense.  Basically you still gotta bus it to where you have to go after the stop.  Like the rail not going into Palolo Valley, but at most stop on Waialae Ave. To the back of the valley is easily a 45 minute walk.

eyeeatingfish

Re: Cost of Rail
« Reply #7 on: March 20, 2021, 08:02:10 PM »
I still support the rail but I really hope they investigate it some and throw people in jail if they cheated or stole.

changemyoil66

Re: Cost of Rail
« Reply #8 on: March 20, 2021, 09:15:59 PM »
I still support the rail but I really hope they investigate it some and throw people in jail if they cheated or stole.
Unless convicted in court for stealing, mismanaging money is just frowned upon.

Sent from my SM-G950U using Tapatalk

Inspector

Re: Cost of Rail
« Reply #9 on: March 21, 2021, 02:06:51 AM »
I still support the rail but I really hope they investigate it some and throw people in jail if they cheated or stole.
I can’t say for sure. But I don’t think any crimes have been committed. Incompetence, mismanagement, lack of communications, etc are not offenses that can be prosecuted. Assuming of course nothing has been stolen. Who I think we should go after is the City/County for allowing all this to happen with little to no oversight. To me that is the key to preventing or minimizing the incompetence we all know is going on here.
SCIENCE THAT CAN’T BE QUESTIONED IS PROPAGANDA!!!

groveler

Re: Cost of Rail
« Reply #10 on: March 21, 2021, 05:57:42 AM »
I rather look to Oahu's rail as a monument to the stupidity of the Democrat party in Hawaii.
Never in the world have so few,  spent so much of others wealth,  for so little return. :wtf:
I'm pretty pissed off, as I just received my property tax acessment.  I wonder how much
of that large increase is going even if indirectly, towards Oahu's choo choo to wherever?
if it is even a single cent, it is too much.